Planning & Architecture
The Pilgangoora Lithium-Titanium project in the Pilbara region required a relocation of an existing accommodation village to a new location 100km away.
Planning the removal and relocation was carefully considered so as not to damage the assets and successfully install them to the new location.
Construction
Buildings were surveyed and dilapidation reports conducted. Removal from cyclone rated footings by crane then transport to the new site was overseen by
Tulloch Construction to successfully provide the client with the accommodation required for the start-up of their new mining venture.