Planning & Architecture
Architect designed, the client brief was to build a state of the art modern design house, using the most efficient building methods.
From Pre-cast Concrete lower storey to Bondor ‘Equitilt’ upper storey panels, this house shows what can be achieved on a small house site.
Polycarbonate wall installations give a natural diffused light throughout the internals without compromising the energy efficient building.
Acoustic lightweight upper floor construction replaced the traditional concrete slab, seen in most two storey construction.
Construction
Following base works, concrete Delta panels were placed into position in two days. Upper storey flooring systems was installed and Bondor ‘Equitilt’ panels were craned to position over three days.
Free Span Bondor roof system meant no internal walls were required to support the load allowing lock up in two weeks.